SAP Basis Consulting

Expert guidance for SAP infrastructure, architecture, and operations planning

SAP Basis Consulting

What We Do

  • SAP landscape architecture design and optimization
  • Infrastructure sizing and capacity planning
  • High availability and disaster recovery strategy
  • System refresh and copy procedures
  • Transport management and change control design
  • Database and OS platform selection guidance
  • Cloud migration feasibility and readiness assessment
  • Technical project management and coordination

Why It Matters

Proper SAP Basis architecture and operations planning directly impact:

  • System Uptime: Well-designed infrastructure reduces unplanned downtime and accelerates recovery
  • Performance: Correct sizing and configuration prevent bottlenecks before they occur
  • Total Cost: Right-sized infrastructure avoids over-provisioning while maintaining service levels
  • Security Posture: Proper architecture includes security controls at the infrastructure layer
  • Change Success Rate: Structured transport management reduces failed deployments
  • Audit Readiness: Documented architecture and processes satisfy compliance requirements

How We Do It

Step 1: Discovery & Documentation

  • Inventory all SAP systems, databases, and infrastructure components
  • Document current architecture diagrams and data flows
  • Review existing SLAs, RPO/RTO targets, and maintenance windows
  • Collect performance metrics and capacity utilization data
  • System landscape documentation
  • Performance baseline analysis
  • Security & compliance audit
  • Risk assessment & action plan
  • HWCCT, Mini-check and EWA report analysis
  • Preventive maintenance activities as recommended by SAP
  • Database optimization and kernel updates
  • Authorization audits and parameter reviews

Step 2: Gap Analysis

  • Compare current state against SAP best practices and industry standards
  • Identify single points of failure and availability risks
  • Assess backup/recovery procedures against RPO/RTO targets
  • Evaluate change management and transport procedures

Step 3: Recommendations & Roadmap

  • Prioritize improvements by business impact and technical risk
  • Provide specific configuration recommendations with rationale
  • Estimate effort, timeline, and resource requirements
  • Define success criteria and validation procedures

Step 4: Implementation Support

  • Prepare detailed implementation plans with rollback procedures
  • Coordinate with application teams and infrastructure providers
  • Validate changes in non-production environments first
  • Document as-built configurations and updated procedures

Deliverables

Architecture Documentation

  • Current-state architecture diagrams
  • System landscape inventory
  • Network topology and integration points
  • Technology stack specifications

Assessment Report

  • Gap analysis findings
  • Risk assessment by priority
  • Compliance status review
  • Performance baseline metrics
  • HWCCT, Mini-check and EWA report analysis
  • Monthly management reports with findings and solutions

Recommendations & Roadmap

  • Prioritized action plan
  • Configuration recommendations
  • Effort and timeline estimates
  • Success criteria definitions

Implementation Plans

  • Step-by-step procedures
  • Rollback and contingency plans
  • Test scenarios and validation steps
  • Updated operational documentation

Typical Engagement Timeline

Phase Duration Key Activities
Discovery 1-2 weeks System inventory, data collection, stakeholder interviews
Analysis 1-2 weeks Gap assessment, risk evaluation, best practice comparison
Recommendations 1 week Roadmap development, prioritization, effort estimation
Implementation Support Varies by scope Execution assistance, validation, documentation